WP-2
WashingDerocker · Oro Industries Derocker 350 · 200 yd³/h rated · Sulphur Creek
Last seen 10:52:58
Digital twin
Live plant view
Feed, trommel speed, water and hopper level follow live telemetry. Drag to rotate, scroll to zoom.
Washing
Current cut
Cut 6 · Bench 2
Gravel and cobbles
Grade
0.021 oz/yd³
Rated capacity
200 yd³/h
Design water
2,000 gpm
Sluice slope
1.5 in/ft
Season runtime
1,470 h
Last cleanup
11-16 15:40
Next cleanup
in 16h 46m
Process
Live process values
Feed rate
141yd³/h
Process water
1,685gpm
Trommel
10.8rpm
Pump pressure
61psi
Hopper
34%full
Recovery rate
2.95oz/h
Recovery
Gold today
10.3 oz
17%
Yards goal
0.021
Grade
2.95
oz/h
Production
Yards washed today
492
yd³ of 2,980 planned · 3.3 h washing since 07:00
Average feed
149 yd³/h
Utilisation
75% of rated
Hours today
3.3 h
Per hour
Yards washed and ounces recovered today
Production day starts at 07:00.
Yards · yd³
Gold · oz
Alarms
Alarms (3)
Oversize chute blocked
2026-11-16 18:48
Nugget trap full
2026-11-16 03:53
Screen blinding detected
2026-11-15 23:36
Process history
Feed rate, process water and trommel speed
Feed rate · yd³/h (rated 200)
Process water · gpm
Trommel · rpm