EX-01
WorkingExcavator · Caterpillar 390F (2019) · 8,866 h · Scroggie Creek
Last seen 10:53:03
Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-1
Operator Helder Ribeiro
Wash plant
s-scr-wp1
Hours today
3.2 h
Cycle time
33s
Cycles today
270
Engine hours
8,866 h
Next service
in 311 h
Telemetry
Live readings
Engine speed
1,764rpm
Coolant
92.3°C
Hydraulic oil
76.3°C
Hydraulic pressure
331bar
Bucket fill
97%
Fuel burn
61.2L/h
Fuel
Tank level
50%
497 L
In tank
61.2 L/h
Burn
8.1 h
Range
Utilisation
Hours on this shift
3.2 h
of a 12 h shift · 27% utilisation
Load
97%
Engine speed
1,764 rpm
Coolant
92 °C
Per hour
Utilisation and fuel burned today
Production day starts at 07:00.
Utilisation · %
Fuel · L
Alarms
Alarms (0)
No alarms on this unit in the last 48 hours.
Engine history
Engine speed, coolant and fuel level
Engine speed · rpm
Coolant · °C
Fuel level · %